January 28, 2009
Olympic team design new Forth crossing
The Forth replacement crossing will be designed by the company responsible for the ‘Bird’s Nest’ stadium at the Beijing Olympics 2008. Engineering firm Arup was also responsible for the world’s second longest spanning cable-stayed bridge, Stonecutter’s Bridge in Hong Kong